Licence to Alter drawings and landlord approval packs for commercial fit-outs in London. Prepared by ARB-registered architects and taken through every stage of approval.

Most commercial leases do not allow a tenant to alter the premises without the landlord's consent. That consent is normally given in a Licence to Alter, a legal agreement completed between the landlord's and tenant's solicitors. Before it is granted, the landlord's surveyor or managing agent reviews the proposed works in detail, and the licence usually sets conditions on how the work is carried out and what must be reinstated at the end of the lease.
LCC prepares the technical package the landlord needs, manages it through each round of review, and then builds the approved scheme. As a design and build contractor, the drawings the landlord approves are the drawings our team builds from.
LCC is led by an ARB-registered architect. Our team of ARB-registered architects, who are also members of RIBA and BIID, prepares every landlord submission and works alongside our fully qualified construction team. The architects who negotiate the approval remain fully involved through construction, ensuring the works on site comply with every condition of the licence.
A fit-out may need three different approvals. Planning permission comes from the local authority, for example for a change of use, a new shopfront or extraction equipment. Building regulations approval covers fire safety, structure, ventilation and access. The Licence to Alter is the landlord's private consent under the lease. Having one does not replace the others, and we coordinate all three.
Landlords commonly return submissions where the shopfront breaches the shopfront zone or lease line, signage exceeds the permitted size or brightness, sprinkler or fire alarm changes are not shown, structural changes lack an engineer's sign-off, or services are not checked against the building's capacity. We check these points before each submission.
We have taken schemes through the landlord approval process at Westfield Stratford City, the Bullring in Birmingham and The O2. At Westfield Stratford City, for Yakiniku Like, our architects took the concept, detailed design, shopfront, signage and services drawings through each stage of the centre's review, agreed the fire strategy with the centre's engineers, and the restaurant opened on the date agreed with the centre. Our shopping centre fit-out guide explains the process in more detail, and our Design, Planning & Approvals page covers planning and building control.
If your lease restricts alterations, which most commercial leases do, you will need the landlord's written consent before work starts. Your solicitor can confirm what your lease requires.
Typically existing and proposed plans, sections, ceiling and services layouts, shopfront elevations, MEP drawings, a fire strategy and specifications, together with method statements and a programme.
It depends on the landlord and on how complete each submission is. A coordinated package at every stage is the most effective way to avoid repeated rounds of comments.
The lease usually requires the tenant to pay the landlord's reasonable legal and surveyor's fees for reviewing the application. Your solicitor can confirm the terms.
Normally no. Starting before consent is granted can put the tenant in breach of the lease.
The licence often requires it. We record the approved works in as-built drawings so reinstatement and dilapidations can be agreed clearly later.
No. The licence is a legal agreement between landlord and tenant. LCC prepares the technical package the landlord needs to approve it.
For landlord approval drawings or a Licence to Alter package, call 020 8960 8899 or email info@lccontractor.co.uk.
Get in touch020 8960 8899